How the size and payback are worked out
- System size = monthly units ÷ 120 units per kW, rounded up to the next 0.5 kW.
- Monthly saving = units used at home × your unit price + exported units × the buyback rate.
- Payback = system cost ÷ yearly saving.
Payback assumes today's electricity price stays the same. Electricity prices in Pakistan have mostly gone up, which would shorten the payback. Panels lose about 0.5% of output a year, and inverters usually need replacing once in 10 to 12 years.
Typical systems by monthly usage
| Units/month | System | Est. cost | Monthly saving | Payback |
|---|---|---|---|---|
| 300 | 2.5 kW | Rs 275,000 | Rs 9,960 | 2.3 yrs |
| 500 | 4.5 kW | Rs 495,000 | Rs 16,920 | 2.4 yrs |
| 800 | 7 kW | Rs 770,000 | Rs 26,880 | 2.4 yrs |
| 1,200 | 10 kW | Rs 1,100,000 | Rs 39,840 | 2.3 yrs |
| 1,800 | 15 kW | Rs 1,650,000 | Rs 59,760 | 2.3 yrs |
Based on Rs 50 per unit, Rs 110,000 per kW, Rs 8 buyback and 60% used at home.
Frequently asked questions
How many units does 1 kW of solar produce in Pakistan?
About 120 units a month on average, more in summer and less in winter and in smog or cloudy weeks. Lahore and Karachi get roughly 5 peak sun-hours a day.
Is net metering still available?
For new connections, NEPRA replaced net metering with net billing under the Prosumer Regulations 2026. Units you export are bought at the national average energy purchase price, far below the price you pay for imported units. NEPRA has not published it as a single figure; CPPA-G’s 2026 projection puts it at about Rs 8 per unit, which is the default here. Consumers with an existing net metering agreement keep their terms until it expires. Confirm the current buyback rate with your DISCO.
Why does using solar power at home save more than exporting it?
Each unit you use directly saves the full price of a unit from the grid (often Rs 45 to Rs 60 including taxes), while an exported unit earns only the buyback rate. Running ACs, pumps and washing machines in the daytime increases your savings.
What does the system cost include?
The cost per kW should include panels, inverter, structure, wiring, protection and installation. Batteries are extra. Prices change often, so enter quotes from local installers.
On-grid, hybrid or off-grid?
On-grid is cheapest and gives the fastest payback but stops during load-shedding. Hybrid adds batteries for backup at a higher cost. Off-grid suits places without a reliable grid connection.
Guides
- Solar net billing in 2026: how a new consumer applies, what it costs and how long it takesStep-by-step guide to new rooftop solar under NEPRA’s Prosumer Regulations 2026: eligibility, documents, the DISCO timeline, one-off costs, sizing and payback.
- How to read your electricity bill (LESCO, IESCO, K-Electric and others)Every line of a Pakistani electricity bill explained, from units and slab rates to fixed charges, FPA, QTA and GST.
- Solar net metering vs net billing in Pakistan (2026): what changed and is it still worth itNew rooftop solar in Pakistan is on net billing, not net metering.
Related calculators
- Solar battery & inverter sizeFind the inverter size (kW and kVA) and lithium or lead-acid battery capacity (kWh and Ah at 12, 24 or 48 V) to run your appliances through load-shedding.
- LESCO bill calculatorEstimate your LESCO electricity bill from the units you used, with 2026 NEPRA slab rates for protected and unprotected users, fixed charges, FPA and GST.
- Construction cost calculatorEstimate the cost to build a house in Pakistan per square foot: grey structure, finishing and contingency, with 2026 Lahore rates.
- Marla converterConvert Marla, Kanal, square feet, square yards and acres instantly.
Sources
- NEPRA Prosumer Regulations 2026, S.R.O. 251(I)/2026 (9 February 2026)
- CPPA-G power purchase price projection for 2026 (energy purchase price, used for the default buyback rate)
- Solar yield assumption: ~5 peak sun-hours/day at 80% system efficiency
This calculator gives an estimate for guidance. It is not official advice. Rates and rules change, so confirm important decisions with the relevant authority or a qualified professional. See how we calculate, or report a mistake.